Contact this profile for a recruitment
- Last name : ********
- First name : ********
- Phone : +91***********
- Email : ******@******.***
- Date of birth : **.**.****
- Nationality : ********
- Address : ********
- Attached CV :
Profile details
Job category searched
- Management
- Production, maintenance, quality
- R&D, project management
Professional experience
Experience in the following industries :
- Chemistry, petrochemistry, raw materials, mining
- Engineering, development studies
- Public buildings and works sector, construction
- Quality, methods
Professional experience
- Construction Manager
- WORLEY
- 10.2022 - 08.2023
- A), Project Name : RAS MARKAZ CRUDE OIL PARK PROJECT. Duration : 09 Oct 2022 to 31.08.23. Company : WORLEY Position : CONSTRUCTION MANAGER. Project Description: • A pair of 42-inch NB Bi-directional subsea pipelines • Pig Launchers / Receivers • Crude Oil Booster Pumps • A pair of 48-inch NB bi-directional Onshore Pipes through piping corridor • Crude Oil Metering / Sampling Packages • Duqm Crude Storage Tanks • Duqm Crude Export Pumps • Online Blending for Duqm Crude Export Facilities • Duqm Crude Tank Stripping Pumps • Duqm Crude Tank Dewatering Pumps • Slops System • Recovered Oil System • Seawater Intake Well, Lift Pumps • Desalination Unit and saline reject water via Seawater Outfall Chamber • Potable Water Unit • Firewater System • Wastewater Collection & Treatment (Oily Water Treatment) • Sanitary Wastewater Collection & Treatment
- Construction Site Reprensatative
- PDO (Petroleum Development of Oman)
- 12.2016 - 01.2022
- B), Project Name : OFF PLOT & ON PLOT DELIVERY CONTRACT : ENGINEERING MAINTANANCE CONTRACT. : THIRD PARTY INSPECTION. Duration : 06 Dec 2016 to 31 Jan 2022 Company : PETROLEUM DEVELOPMENT OF OMAN Position : CONSTRUCTION SITE REPRENSATATIVE (CSR) Work Force : 6000 Direct employees + 75 Indirect staffs + 125 heavy equipment’s Project Description: (North Oman) (Brown field) ● Flow line works, Hook up activities, Rig and Hoist related drilling activities, shutdown jobs etc. ● Underground cable systems, overhead transmission lines, power systems etc. ● Infrastructure works, Major Road works, Utility services, Sewage systems, water treatment plant works etc., Hot oil heater, Heat exchangers, Dehydrator, Culverts, Substations, Asphalt Roads, 12m to 24m high structural works, TSF activities, Warehouses etc. ● Overhead Tans mission lines projects and 440/220KVsubstation works.
- Construction Superintendent
- EXXON MOBIL
- 04.2015 - 11.2016
- C), Project Name : WEST QURNA 1 MAJOR PROJECTS (Section 2) : CRUDE TANK PHASE II & WET CRUDE TREATMENT FACILITY Cost : 300 Million USD Duration : 01 April 2015 to 10 Nov 2016 Company : EXXON MOBIL IRAQ LIMITED (EMIL) Position : CONSTRUCTION SUPERINTENDENT Work Force : 4000 Direct employees + 45 Indirect staffs + 75 heavy equipments Project Description: (West Qurna I Major Projects) (Brown field) ● Underground cable systems, overhead transmission lines, power systems etc. ● Crude Tank Phase II (8 no’s, 40m dia x 8 m height. Capacity 5000 cu.m.) ● Infrastructure works, Major Road works, Utility services, Sewage systems, water treatment plant works etc. ● Construction and procurement of Pipe Rack foundations, KO drums, Hot oil heater, Heat exchangers, Dehydrator, Culverts, Substations, Asphalt Roads, 12m to 24m high structural works, TSF activities, Ware houses etc.
- Construction Lead
- QATAR GAS
- 07.2011 - 03.2015
- D). Project Name : QATARGAS HELLIUM (II) PROJECTS& JETTY BOILED OFF GAS PROJECTS Duration : 01 July 2011 to 15.03.2015 Company : QATAR GAS, Qatar. Position : Construction Lead. Work Force : 3000 Direct employees + 55 Indirect staffs + 125 heavy equipments Project Description: (QATARGAS HELLIUM (II) PROJECTS) • Flow Water Knock Out Tank: Capacity of 100,000 Sm3 per tank per day. (Dia 39 m x 11.5m) • Emulsion Transfer Pumps: Capacity of 16000 Sm3 per day per pump. • Water Injection Pumps (6 nos): Capacity of 16000 Sm3 per day per pump. • Instrument Air Package. • Main Pipe Racks, Flare Package, Process drain pumps etc. • Control buildings and Security buildings etc.
- Senior Resident Engineer
- HILL INTERNATIONAL
- 11.2008 - 04.2011
- D). Project Name: AL-FATEH UNIVERSITY AND HOSPITAL PROJECTS. Duration : 01 Nov 2008 to 15 APRIL 2011 (2 years and 4 months) Company : Hill International, Libya Position : Senior Resident Engineer Work Force : 4000 Direct employees + 75 Indirect staffs + 50 heavy equipments Project Description: • 65 numbers of University buildings, each building having Ground + 5 storied. • Hospitals and Medical centre (Ground + 3 storied buildings) • Infrastructure and Landscaping works. • Construction of Asphalt roads, and Paving
- Senior Civil Engineer
- QATAR GAS
- 11.2005 - 10.2008
- E). Project Name : PIPE LINES FROM OFFSHORE TO SHELL GTL PALNT Duration : Nov 2005 to Oct 2008 (2 year and 11 months) Company : Qatar Gas- Qatar. Position : Senior Civil Engineer Project Description • 9 km underground gas pipe line (40”-2 no, 20”- 1 no) from offshore to SHELL GTL plant. • Micro Tunneling works at all main road crossings. • Involved in Jetties and Berth works. • Involved in Beach pulling works from Offshore to Onshore. • Major excavation, Goal post and foundation installations, Culverts, Road crossings, • Construction of ware houses, Steel structures etc. • RCC buildings, Substation, Control rooms, Steel structure, Cross country pipe line works. • 6 km under ground and over ground 38” pipe line including road crossings
- Area Field Engineer
- PDO (Petroleum Development of Oman
- 04.2000 - 11.2005
- F). Project Name : PDO (PETROLEUM DEVELOPMENT OMAN), 5 years Service Contract Duration : April 2000 to Nov 2005 (5 year and 7 months) Company : STS, PDO Position : Area Field Engineer Work Force : 5000 Direct employees + 75 Indirect staffs + 125 heavy equipments Project Description • Mercury Foundation works at inside plant. • LPG purifier plant works. • Vessel and Chimneys foundation works. • Cross Country GRE pipe line works. • Flow line works. • Power plant foundations. • On plot and Off plot works, Hook up activities. • Culverts, Ware houses, Steel structures, Precast Foundation casting and installation etc.
- Civil Engineer
- Al GEEMI PARTNERS
- 01.1997 - 04.2000
- G). Project Name : GEEMI TOWER AND CINEMA HALL Duration : Jan 1997 to Apr 2000 (3 year and 3 months) Company : Al- Geemi & Partners, Abu Dhabi. Position : Civil Engineer Project Description • 17 storied Office building with car park at Abu Dhabi. • 14 storied Residential buildings with car park at Abu Dhabi. • G + 4 storied buildings (8 no) at Alain. • Underground subways (4 no) and Paving works.
Skills
Leadership / Execution / Quality / Management / Planning / Programme
Education
Education level : Bachelor
- Chattiskar University
- 05.2001 - 04.2005
- Construction related studies / Execution / Leadership / QA QC etc.
Bachelor in Technology Civil
- Anna University
- 05.1981 - 04.1984
- Construction related studies / Execution / Leadership / QA QC etc.
Diploma in Civil Engineering
- American University
- 05.2015 - 08.2016
- Safety / Environmental related construction works.
OSHA
Key Skills
- I have 34 years of Vast construction experience
- especially in Oil Gas (Onshore and etc. Offshore)
- Hydrocarbon areas
- Brown Fields
- Road works
- Infrastructure works
- Power Plant
- Substation works
- Over Head Lines & Transmission lines
- Utility services
- Multistoried building
- Hospitals
Languages
- Arabic
- Good level
- English
- Fluent
- Hindi
- Fluent
- Tamil
- Fluent
More information
- Availability : immediately
- Geographical flexibility : Arusha - Dar es Salaam - Dodoma - Geita - Iringa - Kagera - Katavi - Kigoma - Kilimanjaro - Lindi - Manyara - Mara - Mbeya - Morogoro - Mtwara - Mwanza - Njombe - Pemba - Pwani - Rukwa - Ruvuma - Shinyanga - Simiyu - Singida - Songwe - Tabora - Tanga - Zanzibar - International
- Place of residence : Eruvadi-post
- Accepted employment type : Permanent contract - Fixed-term contract - Temporary work
- Last updated : 24.06.2024
- Total views CV : 57
Other profiles that may interest you
Profile n°00112246
- Work experience: 2 to 5 years
- Industries: Call centers, hotlinesDistribution, selling, wholesaleEducation, trainingServices otherSocial, public and human services
- Education: College
-
- Dakawa Teacher's College
- 05.2013 - 05.2016
Education
- Languages: English (intermediate) & Swahili (fluent)
- Skills:
Result oriented
Operational analysis